Description
Environmental impact studies including public
health, air and water quality, as well as
pollution mitigation, in addition to the design
of hardscape, soft escape, irrigation schemes
and aesthetic lighting of 93.76 km dual 3-lane
motorway and a 6 km dual 2-lane connection
road, including 3 motorway interchanges, 1
connection road interchange, 2 at-grade
junctions, 31 small structures (dimensions up
to 10 m x 5 m), 2 parking areas, 1 TIR area, and
3 toll areas. Services covered preparation of
related geodetical works and 1/1.000
mapping, soil investigations, hydraulic and
hydrologic calculations, 1/1.000 drainage
designs, traffic marking and signing, guardrail
fence designs, landscape design, geotechnical
reports, bills of quantities, earthworks
quantities, mass and haul diagram, and
schedules for expropriation plans.