single page feature image

    Project Details

  • Category:
  • Client: Ministry of Transport
  • Location: ASIR/KSA
  • Date: 2012
  • Cost: 225 million SAR

    Contact Info

  • Sericon Building, Riyadh
  • +966 11 475 66 55
  • info@euroconsult.com

Auhod Rofaiydah Bypass ASIR/ KSA

Description

Alignment selection, preliminary and final designs, and preparation of tender documents for an 12 km 4-lane dual carriageway passing through safak mountains comprising 2 grade separated interchanges; drainage network, landscaping and irrigation, street lighting, and road safety features.

Project Components

  • 12 km of 4-lane dual carriageway.
  • 2 grade separated
  • 3 Wadi Bridges.

Services Performed

  • Alignment Selection
  • Preliminary & Final Design
  • Tender Documents