single page feature image

    Project Details

  • Category:
  • Client: Ministry of Transport
  • Location: ASIR/KSA
  • Date: 2012
  • Cost: 685 million SAR

    Contact Info

  • Sericon Building, Riyadh
  • +966 11 475 66 55
  • info@euroconsult.com

Auhod Rofaiydah Bypass ASIR/ KSA

Description
Alignment selection, preliminary and
final designs of 37 km of an expressway
tying King Abdullah Road to Taif / Abha
expressway. The Road composes 4-lane
dual carriageway with 2-lane service
roads, 6 grade separated intechanges,
drainage network, landscaping and
street lighting.

Services Performed
• Feasibility & Traffic study,
• Alignment Selection,
• Preliminary & Final Design,
• Tender Documents.

Project Components
• 30 Km of 4-lane dual carriageway.
• 6 new Interchanges.
• 5 Wadi Bridges.