Description
This include the Geometrical and Structural design Final Design of the directional interchange and wadi bridge along the road with total length of 5km of 2-lane ramps and an area of about 13,000 m2 of bridges structures.
Description
This include the Geometrical and Structural design Final Design of the directional interchange and wadi bridge along the road with total length of 5km of 2-lane ramps and an area of about 13,000 m2 of bridges structures.
Services Performed
Project Components
Copyrights © 2020 All Rights Reserved by Euro Consult