Description
The project scope of work include alignment selection, preliminary and final designs, and preparation of tender documents for an 40 km 4-lane dual carriageway comprising 6 grade separated interchanges and 12 crossing bridges. The scope also comprises the detailed design of the required drainage works and flood protection measures to protect the project area against flash floods. It also include landscaping and irrigation, street lighting, and road safety features.