single page feature image

    Project Details

  • Category:
  • Client: Ministry of Transport
  • Location: Jeddah/ KSA
  • Date: 2012
  • Cost: 210 million SAR

    Contact Info

  • Sericon Building, Riyadh
  • +966 11 475 66 55
  • info@euroconsult.com

Improvement of Asfan Road

Description

Alignment selection, preliminary and detailed design for 28 km 3-lane dual carriageway or primary road tying Asfan district to Harrameed Expressway in Jeddah. The scope of work also include the design of 2-lane service road serving the nearby settlements, 5 grade separated interchanges, 1 railway crossing, drainage and bridges works and street lighting.

Services Performed

  • Alignment Selection
  • Preliminary & Final   Design
  • Tender Documents

Project Components

  •  28 Km of 3-lane dual carriageway.
  • 2-Lanes service road
  •   5 grade separation intersection.
  • 1 Railway Crossing