Description
The scope of works comprises the
preliminary and final design of 20
grade separated interchanges, 4
Camel crossing, 115 km of dual
carriageway access road along
the existing Qassim-MadinahYan b u-Rab igh E xp r e s s w ay.
Description
The scope of works comprises the
preliminary and final design of 20
grade separated interchanges, 4
Camel crossing, 115 km of dual
carriageway access road along
the existing Qassim-MadinahYan b u-Rab igh E xp r e s s w ay.
Services Performed
• Feasibility & Traffic study,
• Preliminary Design,
• Final Design,
• Preparation of Tender Documents
Project Components
• 20 interchanges along QassimMadinah-Yanbu-Rabigh Expressway,
• 115 km of 2/3-lane dual carriageway,
• 4 camel crossing,
• 65000 m2
of wadi and road crossing
bridges.
Copyrights © 2020 All Rights Reserved by Euro Consult