single page feature image

    Contact Info

  • Sericon Building, Riyadh
  • +966 11 475 66 55
  • info@euroconsult.com

Bursa Ring Road / TURKEY

Description
Socio-economic analysis, financial and
economic evaluation, environmental
impact studies including public health, air
and water quality, as well as pollution
mitigation, in addition to the design of
hardscape, soft escape, irrigation schemes,
aesthetic lighting and tender documents
for a 62 km motorway (passing through a
seismic zone), with 11-grade separated
interchanges, 2 twin-tube tunnels (1.200
and 500 m in length ), 5 viaducts, 125 box
culverts, 9 overpasses, 31 underpasses, 5
motorway bridges, 6 river bridges, and
parking, service, maintenance and toll
areas. Works included storm water
drainage, landscaping, lighting and safety
features.

Services Performed
• Preliminary & Final
Design of Landscape.
• Environmental Studies.
• Tender Documents.

Project Components
• 62km of 3-lane dual
carriageway
• 11 interchanges.
• 2 twin tube tunnels.
• 5 overpasses, 31
underpasses.
• 6 wadi bridges.